ENERGY MANAGEMENT & CONTROL
PRO-TEMP® Sales and Service since 1988
 
PRO-TEMP® Controls are designed for controlling large scale Domestic water heating systems, Hydronic (hot water) space heating systems, and Steam space heating systems found in apartment buildings, dormitories, hotels, motels, and office buildings.
 

Many hotels, apartments and other commercial buildings are getting soaked by inefficient hot water recirculating systems. Fuel-hungry systems that canít vary supply according to demand. And waste thousands of dollars heating (and reheating) water when thereís no or low need for it.

PRO-TEMP combats ambient heat loss with a computer that monitors and modulates the temperature of the hot water supply. Using sensors, a relay and computer memory to record patterns of user demand, PRO-TEMP directs the heater/boiler to meet fluctuating demand with the lowest effective water temperature.

The result is an advanced domestic hot water system. Without the cost or complexity of EMS systems and other conservation efforts. Return on investment is fast and dramatic-usually within 6-24 months.

Unlike mechanical timers, PRO-TEMP can cope with unexpected increases in demand by overriding established usage cycles. And because the computer constantly updates the seven-day usage history, PRO-TEMP will accommodate seasonal shifts in climate and building occupancy

Ideal for new or retrofit applications, only PRO-TEMP applies todayís energy technology in such a unique specific way And you wonít need credits, rebates or other incentives to justify a PRO-TEMP installation-documented savings are linked directly to PRO-TEMPís performance.

 


 

 

PRO-TEMP DOMESTIC HOT Water System Control Requirements

Must be a re-circulating loop type system

The circulator pump must run continuously

The system recovery should be 4 hours or less

 

 

PRO-TEMP HYDRONIC HEATING System Control Requirements

System must be a closed loop

Pumps should run independently of the boiler(s)

 

 

PRO-TEMP STEAM System Control Requirements

System can be one or two pipe design

Boiler should be on/off or staged operation

 

 

 

Click here to learn how Energy Management & Control solves this problem, saving you money.


 
ABOUT ENERGY MANAGEMENT & CONTROL
PRO-TEMP PRODUCTS

SERVICES

CONTACT ENERGY MANAGEMENT & CONTROL
ABOUT PRO-TEMP CONTROLS

 
Site designed and hosted by Octaweb, Inc.